nrzxfquxq |
Wysłany: Sob 14:37, 18 Gru 2010 Temat postu: Jinshuitan measured seepage of the dam Summary _18 |
|
,ugg boots sale
Jinshuitan measured seepage of the dam Summary
amcrestdisplacementwithdifferentelasticmodulusEl (GPa) GPa) △ 8m (mm) A ~ m (mm) △ 8m (mm) 20l55.83l2.63820304.1llO. 555.9325203.429_3l5. O225302. O56.623.1330251.3l5.282.643.3 data pre-processing of output data normalized so that E. ,tiffany deutschland, The network output (O, 1) interval, increasing the s function with gradient descent ll tends to zero, its method of data preprocessing is: y =-!. Mexico × o. 8 + o. 1 = i × o. 8 + o. 1 (where i = l, 2, j = l, 2,3),mbt calzature uomo, the results shown in Table 4. Table 4 training data Tab/e4Dataofleamingsamp ~ s network desired output network input YlPYb882D8O_366667O. 1ooOoo0.419435O. 9ooO000.572792O_366667O. 9ooO000.29788O. 753oo40.4265020.633333O_366667O. 249ll70.66537l0.362l9l0.633333O. 9ooO00O. 152297O. 4752650.228622O. 9OO000.633333O. 1Oo7070.3805650.1939933.4 network training and inversion samples in Table 4,p90x workout schedule, the input to the network for training, after repeated iterations objective function lxl0 a network, the trained network to return to operation, Table 5 for the network inversion results, and displacement by the normalization processing, the dam of concrete elastic modulus E. = 29.75GPa, the bedrock of the elastic modulus E = 26.29GPa. Use of such methods of observation points PL15401 intelligent back analysis, we can see the dam concrete elastic modulus E. = 28.96GPa, the bedrock of the elastic modulus E2 = 27.04GPa. Table 5 Network operating results Table5: Resultofnetworkingrun network input network output 88 known 8E1E2O. 1O. 3784450.192580.8868O. 7O224 Conclusion In this paper,UGG Schuhe, intelligent back analysis has been Geheyan concrete dam body and the elastic modulus of the bedrock, to a certain extent, reflect the physical parameters of concrete and rock. The method of evaluating the strength and stability of the dam, the dam operating conditions control, testing the correctness of the design to ensure the safe operation of the dam provides a reliable analysis of data, is of great significance. ■ |
|